CHAIN SHIPMENT PATH-2

CHAIN SHIPMENT PATH-2

a)Pumice blocks delivered from chain shipment path 1 start moving with acceleration as the number of blocks reached to the desired value, each pumine block being separated from other blocks and is transferred to differential table.

b)With the help of speed control device, stopping and taking-off can be adjusted as of accelerated.

c)PC controlled.